Guidage de Construction
Guidage par Jumeaux Numériques
Solution DataMesh — Guidage par Jumeaux Numériques
Close the gap between design intent and field execution
BIM models represent design intent. Construction reality often deviates. AR-guided construction keeps field work aligned with design by projecting digital plans onto the physical environment through DonnéesMesh One — workers see exactly what should be built, where.
Bring expert guidance to every construction site
Not every site has experienced supervisors. Director-authored 3D procedures ensure consistent installation quality by providing step-by-step guidance that any worker can follow on-site through DonnéesMesh One.
Review and coordinate before building
When multiple trades share the same space, coordination before installation is critical. The FactVerse digital twin enables spatial review where all parties can visualize the plan together, discuss issues, and agree on sequencing before work begins.
Related Products
- FactVerse — BIM visualization & digital twin
- Director — 3D procedure authoring
- DonnéesMesh One — AR on-site delivery
Résultats Typiques
| Indicateur | Impact |
|---|---|
| Rework rate | ↓ 30–50% through AR design overlay verification |
| Installation accuracy | ↑ to 98%+ first-pass compliance |
| Design review meeting time | ↓ 40% with spatial 3D collaboration |
| Training time for new subcontractors | ↓ 50% with guided procedures |
| RFI resolution | ↓ 60% through on-site BIM visualization |
Éprouvé sur le Terrain
Obayashi Corporation deployed DonnéesMesh Director to provide MR-guided construction procedures for railway tunnel work. By overlaying BIM models with DonnéesMesh One, field workers could verify each construction step against the digital plan — reducing interpretation errors and improving work quality across multiple job sites. Read the case study →
Questions fréquentes
DFS se connecte via des protocoles standard (OPC UA, BACnet, REST API) aux systèmes existants.