Lösungen

Bauanleitung

Digitaler-Zwilling-gesteuerte Bauführung

3D-Digitale-Zwilling und Mixed Reality für präzise Vor-Ort-Führung und Qualitätsprüfung.

Key Capabilities

BIM-Baustellen-Vergleich

BIM-Modelle über die reale Baustelle legen, um Design und Ist-Zustand zu vergleichen.

Schrittweise Bauanleitung

3D-Schritt-für-Schritt-Anleitungen mit Director erstellen.

Close the gap between design intent and field execution

BIM models represent design intent. Construction reality often deviates. AR-guided construction keeps field work aligned with design by projecting digital plans onto the physical environment through DatenMesh One — workers see exactly what should be built, where.

Bring expert guidance to every construction site

Not every site has experienced supervisors. Director-authored 3D procedures ensure consistent installation quality by providing step-by-step guidance that any worker can follow on-site through DatenMesh One.

Review and coordinate before building

When multiple trades share the same space, coordination before installation is critical. The FactVerse digital twin enables spatial review where all parties can visualize the plan together, discuss issues, and agree on sequencing before work begins.

Related Products

Typische Ergebnisse

KennzahlAuswirkung
Rework rate↓ 30–50% through AR design overlay verification
Installation accuracy↑ to 98%+ first-pass compliance
Design review meeting time↓ 40% with spatial 3D collaboration
Training time for new subcontractors↓ 50% with guided procedures
RFI resolution↓ 60% through on-site BIM visualization

Praxisbewährt

Obayashi Corporation deployed DatenMesh Director to provide MR-guided construction procedures for railway tunnel work. By overlaying BIM models with DatenMesh One, field workers could verify each construction step against the digital plan — reducing interpretation errors and improving work quality across multiple job sites. Read the case study →

Häufig gestellte Fragen

Funktioniert auf iPad, iPhone, HoloLens 2, Meta Quest.